Cab Light Installation... NEW @ AdmireTheShine.com!

A special Thanks to Brock Burington with Double Jack Trucking!

Here is a summary of installation for the 38503 Cab Clearance lights.
 
Before Picture:
Note all the Lights that were burned out!

Before picture


Tools used: 1/4" Ratchet and torque bit

Scraper

Small torch

Wire cutter/ Strippers

Scraper

Heat shrink Butt Connecters

Straight screwdriver (just in case)


--------------------------------------------------------------------

Step 1

Picture of tools Used!

Step 1

--------------------------------------------------------------------

Step 2

Begin by removing the torque head bolts,
 the light and cut the wires.

Step 2

--------------------------------------------------------------------

Step 3

Then use the gasket scraper to remove the old gasket, making sure the surface is clean.

Step 3

--------------------------------------------------------------------


Step 4

Picture of surface before next step.

Step 4

--------------------------------------------------------------------


Step 5

Then place 1 butt connecter in each wire
and crimp one end.

Step 5

--------------------------------------------------------------------

Step 6

Place the new gasket over the wires.

Step 6

--------------------------------------------------------------------

Step 7

The bottom of the new light.
 Notice the loop for the ground wire.

Step 7

--------------------------------------------------------------------

Step 8

Remove the loop and strip both wires.

Step 8

--------------------------------------------------------------------

Step 9

 Test the connection before crimping. There is a polarity to the wires so leave the lights on while doing this.

Step 9

--------------------------------------------------------------------

Step 10

Confirm that the polarities are correct and crimp the other end of the connectors. Carefully use the torch to shrink the connectors for a water proof connection.

Step 10

--------------------------------------------------------------------

Step 11

My truck did not need the new well nuts so I used the old torque heads. Note: The new screws would not work in the old holes so I just use the rubber O ring on my bolts.

Step 11

--------------------------------------------------------------------

Step 12

Screw down tight and your ready to go!

Step 12

--------------------------------------------------------------------

After Picture taken in low light.

After Picture!

--------------------------------------------------------------------

After picture taken in the dark!

Dark After picture

Look how these babies light up now!

--------------------------------------------------------------------


Thanks again, Brock!